Sign In | Join Free | My himfr.com
Home > Excavator Construction Equipment >

35° Climbing Excavator Construction Equipment 7.79L Displacement

TIANJIN COMMAND MACHINERY MANUFACTURING CO.,LTD
Contact Now
    Buy cheap 35° Climbing Excavator Construction Equipment 7.79L Displacement from wholesalers
     
    Buy cheap 35° Climbing Excavator Construction Equipment 7.79L Displacement from wholesalers
    • Buy cheap 35° Climbing Excavator Construction Equipment 7.79L Displacement from wholesalers

    35° Climbing Excavator Construction Equipment 7.79L Displacement

    Ask Lasest Price
    Brand Name : COMMAND MACHINE
    Model Number : CWJ-M
    Certification : ISO
    Price : Negotiation
    Payment Terms : TT L/C
    Supply Ability : 10+SET+per35DAYS
    Delivery Time : 35days
    • Product Details
    • Company Profile

    35° Climbing Excavator Construction Equipment 7.79L Displacement

    EXCAVATOR


    Product highlights

    By using the "positive flow" system and the self-developed engine pump valve integrated dynamic optimization intelligent control system, the fuel consumption efficiency is 8% higher and the fuel consumption is 10% lower.

    By improving the safety, heat dissipation capacity, using efficient filtration system and "high anti-corrosion" coating, the adaptability to the environment, working conditions and oil products can be improved.

    The cab is designed according to the engineering mechanics: the cab is spacious and bright, 360 ° wide vision, and the equipment operation is easier and smoother.

    The newly designed fuel oil filtration system adopts three-stage filtration to improve the filtration accuracy, and two-stage has the function of water separation to improve the efficiency of water separation and increase the ash capacity, which is widely applicable to all kinds of oil products in the Chinese market.

    Through the current advanced methods such as structural optimization design, stress test, welding and plate research, durability test, ut detection of key parts and two-axis fatigue test, the service life of key structural parts is comprehensively improved.


    Specification:

    total weight: 29120kg, bucket capacity: 1.35M ³

    Engine model: gh-6hk1xksc-01 rated power: 212kw / 2000rpm

    Large torque: 1080nm / 1500rpm displacement: 7.79l

    Performance: travel speed: 5.1/3.2km/h, rotation speed: 9.5rpm

    Climbing capacity: 70% (35 °) ground specific pressure: 58kpa

    Bucket digging force: 185kN stick digging force: 143kn

    Number of track shoes in the traveling part: 45 carrier sprockets each side: 2

    Each side of roller: 7 standard track: 600mm

    Oil and coolant capacity

    Fuel tank: 540l hydraulic tank: 380L

    Engine oil: 35L radiator: 31.9l

    Final drive: 2 × 4.0L

    Quality 35° Climbing Excavator Construction Equipment 7.79L Displacement for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: TIANJIN COMMAND MACHINERY MANUFACTURING CO.,LTD
    *Subject:
    *Message:
    Characters Remaining: (0/3000)